Marine Link
Sunday, November 17, 2024

ABB Wins Dredger Package Deal

Maritime Activity Reports, Inc.

June 18, 2019

Photo: ABB

Photo: ABB

ABB was contracted to deliver integrated vessel systems to two dredgers being built by Keppel Offshore & Marine for Van Oord, a key contract win for a new market: specialized dredgers.

This is ABB’s largest dredging vessel project for a European end customer, a contract that covers integrated electrical power, automation, control and navigation packages for a pair of 10,500 cu. m. capacity trailing suction hopper dredgers built for the Dutch dredging and marine contractor Van Oord. The vessels, which will feature dual-fuel engines, are being built by the Singaporean yard Keppel Offshore & Marine and are due for delivery in 2021.

The scope of supply includes generators, main switchboards, distribution switchboards, propulsion drives with associated control systems and transformers. ABB will also supply a Power Management System, an Alarm Management System and a Vessel Management System based on ABB AbilityTM System 800xA, as well as a highly customized dredging control system, which will help increase the efficiency of dredging operations.

Additionally, ABB will deliver a complete bridge solution, which will include custom-designed ergonomic consoles, a remote-control system, pilot chairs, and a navigation system. As part of the navigation package, ABB will integrate the Synapsis NX INS bridge and navigation technology from Raytheon Anschütz. The system includes multifunctional workstations, autopilot and track control system, radars, navigation sensors that fully integrate with ABB’s propulsion, automation and control.


Subscribe for
Maritime Reporter E-News

Maritime Reporter E-News is the maritime industry's largest circulation and most authoritative ENews Service, delivered to your Email five times per week