Jumbo’s DP2 heavy lift vessel Jumbo Javelin has successfully installed the first Transition Pieces (TPs) for the Anholt Offshore Wind Farm in Denmark. The operation was performed as planned with respect to every detail: transport, installation, accessibility of the TP, grouting and safety. Once again Jumbo proved to have an efficient concept for the transport and installation of wind farm foundations with the use of only one free floating vessel on DP.
Subscribe for Maritime Reporter E-News
Maritime Reporter E-News is the maritime industry's largest circulation and most authoritative ENews Service, delivered to your Email five times per week