Royal IHC Delivers another Dutch Dredger
On February 18, 2016, Royal IHC delivered the trailing suction hopper dredger (TSHD) Mahury to Baggerbedrijf de Boer – Dutch Dredging. The twin-screw TSHD was built at IHC’s partner shipyard, MTG Dolphin, in Varna, Bulgaria.
The Mahury was launched on August 14 and named on October 29, 2015 in Varna. It is the fourth TSHD of Baggerbedrijf de Boer – Dutch Dredging built by IHC, following the Albatros, Amazone and Lesse.
Main features
Length approx. 75m
Breadth 13.4m
Depth 4.1m
Draught at dredging mark I, dredging
within 15 miles from shore approx. 3.48m
Draught at dredging mark II, dredging
within 8 miles from shore approx. 3.80m
Hopper capacity at highest overflow
level approx. 1,840m3
Inside diameter of trailing suction
pipe 600mm
Dredging depth 30m
Total installed power approx. 2,440kW
Trial speed approx. 9.3knots
Accommodation 9 people