Tall Ship Christian Radich Returns For Dry Docking
A&P Tees, part of the A&P Group once again welcome the Christian Radich for dry docking. The three masted, 72 x 10m vessel plans to stay for 30 days.
The Scope of Work includes cleaning and painting, removal of bow spirit for repairs, tank steel repairs/renewals including riveting, replacement of water tank, conversion of forepeak tank to black water tank, renewal of funnel exhaust pipes and replacement galley flooring.
Having also worked on the ‘Tall Ship’ in 2011, it certainly is a change of vessel type to be working on at the Tees site from generally dealing with dredgers, gas carriers and cargo vessels.