Study: How Changes in Shipping Patterns Affect Whales
Understanding how changes in shipping traffic and distributions of fin, humpback, and blue whales in the Pacific Ocean affect the risk of whales being struck by ships is the focus of a new study published in the scientific journal, Frontiers. The findings also have implications for highly endangered North Atlantic right whales in the Atlantic Ocean.Dr. Jessica V. Redfern, an Ecologist, Senior ScientistâŠ
Vessels Queue Grows as Salvage Continues on the Intracoastal Waterway
Nearly 200 towing vessels and 600 barges are queued on the Intracoastal Waterway while salvors work to clear a halved and partially sunken rock barge near Berwick, La., the U.S. Coast Guard said.A section of waterway has been closed since Sunday night, when a towing vessel pushing six rock-filled hopper barges ran aground at mile marker 99.The push boat Miss Odessa was reportedly transiting southboundâŠ
Offshore Installation Ship Island Victory Delivered
Island Offshore took delivery of Island Victory, a new offshore installation vessel, at VARD Langsten today (Friday, February 7, 2020).Upon delivery the vessel will head straight into operation, spending a couple of weeks in the spot market, before commencing a series of contracts â in the Barents Sea and the Gulf of Mexico â securing work for the vessel potentially throughout October this year.âWe experience great interest for this vesselâŠ
Four More Icebreaking LNG Carriers for Smart LNG
Smart LNG LLC, a joint venture of Sovcomflot and Novatek, signed an agreement with VEB.RF Group for lease financing of four Arc7 icebreaking LNG carriers for the Arctic LNG 2 project.
ClassNK Debuts PrimeShip-HULL Software
ClassNK released the latest version of its design support software PrimeShip-HULL (HCSR) Ver.7.0.0.Developed in response to the IACS Common Structural Rules for Bulk Carriers and Oil Tankers (CSR BC & OT). The new version incorporates the latest rule amendments to CSR BC & OT including amendments based on feedback from the industry.Various functions were also added or improved in the PrimeShip-HULLâŠ
Australia Ship Sim Center Opens
The Western Australian Minister for Ports, the Hon. Alannah MacTiernan MLC opened the expanded facilities of HR Wallingfordâs new Australia Ship Simulation Center.HR Wallingford has added two new purpose-built simulators to its center in Fremantle, bringing the total number of simulators that it owns and operates there to six. This makes it one of the largest ship simulation centers in Australia and allows a full maneuvering team (including pilotsâŠ
Feadship Launches 99.95-M "Moonrise"
Feadship has launched the 99.95-meter Moonrise, the largest superyacht by waterline length built in the Netherlands to date.Unveiled by the Feadship yard in Makkum, she offers a wide range of elegant details, long hull windows, a grey hull and striking vertical bow add to the elegance of the design by Studio De Voogt.Moonrise has an impressive volume thanks to a 15.5-meter beam, which allows for 16 people in eight staterooms.
Ship Repair: Bayonne Drydock Invests in Shiplift
Bayonne Drydock & Repair in Bayonne, NJ, reported brisk business in 2019, with the BDDRC floating drydock and graving dock in use approximately 98 percent of the time, according to Bob Magas, General Manager Commercial Operations, BDDRC. Driving business was a variety of topside repair projects with existing clients, as well as three âsuccessfully completed MSC vessel drydockings, on time and on budget,â according to Magas.
Are OSVs Fit for Refit for Offshore Wind?
While it is generally agreed that the nascent offshore wind energy market in the U.S. will be a newbuild market, there is a repair and conversion possibility for some stacked OSVs.Though estimates on the pace of the offshore wind energy market in the U.S. vary widely, the direction is clear: offshore wind will be a huge marketplace for construction and support vessels to be deployed in U.S. waters over the next decade.
Coronavirus Cases Rise on Cruise Ship Marooned off Japan
Dozens more people onboard a cruise ship quarantined in the port of Yokohama, Japan, tested positive for the coronavirus on Friday and thousands of passengers remained confined to their cabins, only allowed on deck briefly for fresh air.The Diamond Princess, owned by Miami-based Carnival Corp, was placed on a two-week quarantine on arriving at Yokohama on Monday after a man who disembarked in HongâŠ
Coronavirus Disrupts Air and Sea Freight, Prices to Rise -DSV
China's fast-spreading coronavirus is squeezing air and sea freight capacity in the country with a spike in freight rates a likely consequence, one of the world's biggest transport and logistics companies said on Friday.The spread of the deadly virus has shut down many cities and factories in China and disrupted global air travel."We are already now seeing capacity problems on air freight," Jens Bjorn Andersen, chief executive of freight forwarder DSV Panalpina said.
Baltic Index Falls
The Baltic Exchange's main sea freight index declined on Friday as lower rates for capesize and supramax segments offset gains in the panamax category.The Baltic index, which tracks rates for capesize, panamax and supramax vessels to ferry dry bulk commodities, dropped 16 points, or 3.7%, to 415.The main index has lost nearly 14.8% this week, its ninth consecutive week of decline.The capesize index fell 47 points to a negative 234âŠ
Partners Developing Electric Launch for Canaveral Pilots
Glosten said it is working with fellow naval architecture firm Ray Hunt Design and the Canaveral Pilots Association on a pilot/demonstration project for the design, construction and operation of an electric pilot boat.Marking a first for a pilot boat in the U.S., the vessel will feature a battery-electric propulsion system with an emergency âget homeâ diesel engine.During the feasibility-level engineeringâŠ
Havyard Outsources Platform Supplier Work to Kleven
Norwegian offshore vessel builder Havyard will outsource the construction of the Atlantic Harrier platform supply vessel to its compatriot yard Kleven, as delays with other projects have put a strain on Havyardâs Leirvik facility.The platform supplier was first ordered by Fafnir Offshore in 2014, but Havyard in 2017 canceled the order as Fafnir was unable to secure a long-term charter or financingâŠ