Video: Jumbo Completes Offshore Wind Farm Project
Heavy lift: Jumbo recently wrapped up a project installing massive structures at the Arkona offshore wind farm
Earlier this year, Jumbo and its DP2 heavy lift crane vessel MV Fairplayer completed its part of a project to build the Arkona offshore wind farm in the German Baltic Sea.
Van Oord contracted Jumbo to install 60 transition pieces for the 385
The Arkona wind farm, a joint venture between E.ON and Statoil, wind farm will be able to supply up to 400,000 households with renewable energy from 2019.