DCV Balder to Restart Work in Gulf
At the time of the incident the DCV Balder was working in the Gulf of Mexico. Thanks to a quick and professional response from the crew, the situation was brought under control within 90 minutes. In that period of time the operations were successfully and safely stopped without accidents, damage to facilities being installed, or harm to the environment. Immediately after the incident the vessel was able to propel itself to shallow water for a full investigation. The indicated cause of the incident was the inadvertent opening of a cooling water valve during a maintenance operation. Depending on the speed of repairs, the DCV Balder will be operational in February. Heerema's other DCV, Thialf, is en route to the Gulf of Mexico from Brazil and due to arrive in February. The schedules of both vessels will be optimized to minimize the impact on upcoming projects. The Balder will not be fully operational at first and the Thialf can take over some Balder duties.