Meyer Werft Delivers Norwegian Getaway
During a ceremony in Bremerhaven, Norwegian Cruise Line took delivery of the 145,655 gross ton cruise ship Norwegian Getaway from Meyer Werft after a building period of only 15 months. The ship, the second of two Breakaway Class ships, is being delivered just nine months after the launch of sister-ship Norwegian Breakaway. Following delivery, the ship is sailing to Rotterdam for the start of inaugural festivities which will continue in Southampton before the ship departs for her transatlantic cruise to New York. The ship will be christened in Miami on February 7.
“The team at Meyer Werft, along with our new build team, has done an amazing job on Norwegian Getaway and we are thrilled with how spectacular the ship looks,” said Kevin Sheehan, Norwegian Cruise Line’s chief executive officer. “Norwegian Breakaway revolutionized cruising with its Waterfront and strong connection to New York. Norwegian Getaway will do the same as Miami’s ultimate ship, offering the only way to cruise the Caribbean from Miami with a plethora of incredible features.”
The latest engine technology, the diesel-electric pod drive system, improved hydrodynamics as well as effective energy saving, heat recovery and ballast water treatment guarantee an ecological cruise experience at significantly reduced operating costs.
Main Particulars
Dimension 146.600 BRZ
Length overall 325,70 m
Moulded breadth 39,7 m
Number of decks 18
Draught 8,30 m
Engine output 62.400 kW in total
Propulsion power 35.000 kW
Speed 21,5 kn
Number of passengers 4,028
Number of passenger cabins 2,014
Number of outside cabins (including suites) 1,506
Number of inside cabins 508
Crew ca. 1.640
Number of theatre seats 815
Number of dining options 27
Total weight of applied paint ca. 300 t
Total length of laid cables 2.154 km
Total length of laid pipes ca. 400 km
Flag Bahamas
Classification DNV
meyerwerft.de