New Product: Rhosonics CLAMP-IN Pipe Integration System
Rhosonics debuts a pipe integration system for the Slurry Density Meter (SDM) – the Clamp-In, designed to make it easy to remove the sensor without interrupting the process.The Clamp-In allows the installation of existing pipes in the process: plastic pipes, metal pipes or even pipes with internal liners. All necessary mounting materials are supplied with the product, including the drill for making the hole in the pipe. One of the main features of this system is the "hot-tap"…
Tech File: GF Piping Systems Launches Fire-retardant Pipe Jacket System
GF Piping Systems launched HEAT-FIT at Seatrade Cruise Global in Miami, debuting a lightweight, corrosion-free, and efficient thermoplastic piping system.With the HEAT-FIT Jacket System, GF Piping Systems offers a solution that introduces thermoplastic piping systems into essential applications (L3) onboard cruise ships, merchant vessels, and offshore platforms. HEAT-FIT is compatible with the ecoFIT range of polyethylene pipes and fittings designed for industrial applications and water and wastewater treatment.
Tech File: Study Suggests Pre-insulated Plastic Piping Aids Passenger Ships Efficiency
A new study by GF Piping Systems and Foreship shows HVAC applications on passenger ships offer significant potential for improvement. The study, comparing a baseline steel piping system with pre-insulated polyethylene pipes in an air conditioning chilled water system revealed that plastic is more efficient in four areas: It decreases fuel consumption, reduces greenhouse gas emissions, lowers costs, and slightly improves EEXI and CII values.GF Piping Systems, the Swiss flow solutions provider…
IOOC Launches First PIMS
Iranian Offshore Oil Company (IOOC), a subsidiary of the National Iranian Oil Company, has successfully launched its first offshore pipeline integrity management system (PIMS) in the Iranian oil industry.According to IOOC, the system was launched in order to comply with international and national requirements for the standard, safe and continuous operation of the Salman Oilfield’s gas pipelines with a Norwegian company and the Pipeline Technology Company.The project is dubbed as the first of such projects in the Iranian offshore oil industry, said a report in Iran News.A Pipelines Management System (PMS) provides a clear process, with tasks and responsibilities…
Energean, DEPA Pact for EastMed Pipeline
UK-based international oil and gas exploration and production company Energean Oil & Gas and the Public Gas Corporation of Greece (DEPA) have agreed to cooperate to further support the EastMed Pipeline Project.The have signed a Letter of Intent (LoI) for the potential sale and purchase of 2 BCM natural gas per annum from Energean’s gas fields offshore Israel, where Energean is investing $1.7 billion for the development of the Karish & Tanin fields through the FPSO “Energean Power”.DEPA, as a 50% shareholder of the IGI Poseidon – a Joint Venture with Edison S.p.A - is developing the EU Project of Common Interest (PCI) EastMed Pipeline and is a leading player in natural gas supply and retail activities in the Greek and S.
India to Lead Asia New-Build Pipeline Growth
India is expected to lead Asia’s oil and gas new-build trunk/pipeline length additions, contributing around 53 percent of Asia’s planned and announced pipeline length additions between 2019 and 2023.According to a report from GlobalData, India is expected to have new-build pipeline length of 23,360.6 km by 2023.Varun Ette, Oil and Gas Analyst at GlobalData, said: “In India, 42 new-build pipelines are set to start operations by 2023, out of which 29 are planned and remaining 13 are from early-stage announced pipelines. Jagdishpur–Haldia is the longest upcoming pipeline in the country with a length of 2,655.0 km. It is a natural gas pipeline expected to start operations in 2020.
Denmark OKs Nord Stream 2 Project
Denmark has granted permission for the Russian Nord Stream 2 natural gas pipeline to be constructed across Danish seabed in the Baltic Sea, leading to Germany.The Danish decision puts greater pressure on U.S. Congress to quickly pass a sanctions bill to halt the project before it is completed.The pipeline being constructed under the Baltic Sea by Russia's Gazprom energy giant is nearly complete, but had not previously been granted permission to cross Denmark's exclusive economic zone.DEA is in charge of the application to construct its planned pipeline system in the Danish Exclusive Economic Zone (EEZ) south-east of Bornholm which covers…
WFS Subsea System for Allseas
Allseas Group, the offshore pipeline installation contractor, has chosen WFS Technologies’ new Seatooth Pipelogger for the real time measurement of process temperature on a subsea pipeline system which they have installed recently.WFS, the player in subsea wireless automation, Subsea Internet of Things (SIoT) and Subsea Cloud Computing Networks (SCCNs) said that the pipeline system is designed to have a total gas throughput capacity of 31.5 billion cubic meters per year.WFS Technologies’ Pipelogger is a real-time, wireless technology which requires little to no maintenance, and can operate at depths of up to 2,000m without the need for…
Nord Stream 2 is 75% Complete
The Nord Stream 2, export gas pipeline running from Russia to Europe across the Baltic Sea, is 75% complete, the project's operator, Nord Stream 2 AG, said in a statement.A total of 1,855 kilometers of the Nord Stream 2 pipeline were built along the bottom of the Baltic Sea in the waters of Russia, Finland, Sweden and Germany. That's about 75 percent of the total length of the pipeline, the release said.Both strings have already been completed in German territorial waters and Finnish waters. Pipelay is currently ongoing in Russian territorial waters. At the landfalls in Germany and Russia, construction works have reached an advanced stage.All pipes needed for the twin pipeline system have been concrete weight coated.
TurkStream Terminal Nears Completion
Gazprom’s Turkish Stream (TurkStream), the natural gas pipeline running from the Russian Federation to Turkey, has been 95% completed."Construction progress of the receiving terminal for the TurkStream Offshore Gas Pipeline has reached 95%. All works are in line with the schedule. First gas is expected to flow by the end of 2019," said a press note from TurkStream said.Direct and indirect employment related to the construction activities is currently over 1,700. Approximately 100 of the workers have been recruited locally.The TurkStream receiving terminal is realized near the town of Kiyikoy in the Turkish Thrace region. When operational…
Nord Stream's Last Pipe Leaves Sweden Port
The last Nord Stream 2 pipe stored within the premises of the port of Karlshamn left the storage area. Russia’s Nord Stream 2 AG is the operator of the Nord Stream 2 gas pipeline project.Nearly 39,000 pipes have transited through the port since October 7, 2017. Out of these, almost 37,000 pipes have been shipped to the pipelay vessels working on the Swedish section of the Nord Stream 2 Pipeline. The surplus has been transported back to the port of Mukran in northern Germany.Wasco Coating Germany GmbH was in charge of the logistics operations in the port of Karlshamn during this 23-month long period.Up to 140 people worked for the Nord Stream 2 project during the peak period in the port of Karlshamn, when operations went on around the clock.
Tenaris Tests in Culzean Project
Tenaris has pushed the limits of its high pressure/high temperature (HP/HT) technology, and through precision in execution in testing, delivery, running and expert services, generated outstanding results for its work on Total’s Culzean project.According to the supplier of tubes and related services for the world's energy industry and certain other industrial applications the Culzean gas field is located in the challenging waters of the North Sea, about 145 miles off the coast of Aberdeen.The field began production in June and is anticipated, at peak, to provide five percent of the United Kingdom’s gas demand.Tenaris supplied TenarisHydril Blue Max and TenarisHydril Blue Heavy Wall connections…
MDL Wins Equatorial Guinea Pipelay Work
Maritime Developments (MDL), a provider of back-deck equipment for the subsea sector of oil and gas industry, has been awarded a contract to supply a complete pipelay spread and personnel for a flexible installation offshore Equatorial Guinea.The award comes from a new client, whose work scope covers the launch of a number of new wells in an existing network of drill centres in the West African basin, MDL said.The MDL spread will consist of the MDL Horizontal Lay System (HLS), delivered with a 4-track pipelay tensioner; an MDL Second-generation Reel Drive System and MDL’s integrated Track and Cradle System.The project is due to commence in Q3 this year and will be MDL’s fourth campaign in West Africa in 2019.
Boskalis Wins Woodside Scarborough Contract
Dutch dredging company Royal Boskalis Westminster N.V. has been awarded the contract for the seabed intervention and shore crossing activities for Woodside’s proposed Scarborough export gas pipeline in northwest Australia.The contract awarded by Woodside Energy Ltd. (Woodside), in its capacity as operator of the Scarborough Joint Venture, potentially carries a value of EUR 145 million if all options are called and is subject to a final investment decision which is expected in 2020.The contract is for preparatory activities related to offshore deepwater excavation, pipeline crossing, nearshore and shore crossing works for the export trunkline…
ASCO Ships Lay Cable for Absheron Gas
Azerbaijan Caspian Shipping Company (ASCO), the largest and oldest shipping company on the Caspian sea, informed that works on laying pipes in the Absheron gas condensate field in the Azerbaijani sector of the Caspian Sea are under way.“Aura” tow-vessel vessel and “Suleyman Vezirov” pipe- laying ship of the Azerbaijan Caspian Shipping Company (ASCO) were involved in the pipe laying operations.The first phase of the operations has already been completed. Thus, the 13299-meter pipeline between “Darwin Bank” and “Absheron Bank” was fully laid.At present, the pipe laying process is carried out by ships between “Absheron Bank” and “Western Absheron”. The length of this line is 11600 meters.At the next stage, pipe –laying works will be carried out in the gas separator point No.
Balticconnector Offshore Pipeline Completed
Construction work in the sea for the Balticconnector project offshore pipeline was completed Friday 12 July 2019.Pipe laying was finished at the end of June, and the shielding work was begun in mid-June.Now that the shielding work has been finished, all construction work in the sea has been completed. Next, the offshore pipeline will be pressure-tested in July-August, after which the pipeline will be emptied and dried.“We are satisfied that the construction work for the offshore pipeline has progressed on schedule and that we can begin the final phases of the pipeline according to plan. We are progressing at a good pace towards the end of the year when the pipeline will be commissioned…
Trelleborg Wins Elastopipe Contract
Swedish global engineering group Trelleborg's offshore operation has been awarded a major multi-million USD contract by Mexican state-owned petroleum company, Pemex, for Elastopipe.Elastopipe, a patented flexible piping system developed for transporting a variety of fluids, will be installed on board the Abkatun A complex in the Bay of Campeche in the Gulf of Mexico.Morten Kristensen, Business Group Director at Trelleborg’s offshore facility in Norway, said: “This is our first contract made directly with Pemex and the largest contract in our history for Trelleborg’s Elastopipe system. I am pleased to see that Elastopipe is regarded as a safe and reliable firewater system…
DNV GL Wins Baltic Pipe Project
The international oil & gas advisory and classification society DNV GL has won a major contract to provide independent verification services for the Danish transmission system operator Energinet’s section of the Baltic Pipe project, offshore Denmark.The Baltic Pipe project aims to enable the transport of gas from Norway from a tie-in to the existing Europipe II in the Danish North Sea to the export facility in Zealand. The pipeline in the Baltic Sea towards Poland is not included in the contract. The Baltic Pipe project is planned to be fully operational by 1 October 2022.DNV GL’s contract scope includes independent verification and submarine pipeline certification to the DNV GL certification regime DNVGL-SE-0475.
Petrobras Sells TAG, Gets $8.7 bln
Brazilian state-run oil firm Petroleo Brasileiro SA (Petrobras) has concluded the sale of gas pipeline system Transportadora Associada de Gás S.A. (TAG) to a group led by France'sEngie SA and Canada'sCaisse De Depot Et Placement Du Quebec (CDPQ).According to a stock exchange annoucement, Petrobras received a total of 33.5 billion reais ($8.69 billion) from buyers on Thursday for the 90 percent stake it had in TAG.Petrobras will continue to use natural gas transportation services rendered by TAG, through contracts already in force between the two companies, with no impacts on its operations and the delivery of natural gas to its clients.This operation is in line with the company's portfolio optimization and improvement of its capital allocation…
Shawcor Bags $49m in Pipe Coating Contracts
Energy services company Shawcor’s pipe coating division has entered into several contracts with an international EPC contractor to provide coating services for offshore pipeline projects.The projects include: Petrobras’ Mero in Brazil; ConocoPhillips’ Tor 2 in Norway; BP’s Atlantis in the Gulf of Mexico; Energean’s Karish in the Mediterranean Sea; Shell’s Powernap in the Gulf of Mexico; Equinor’s P1 and Duva in Norway.These projects will be executed within Shawcor’s network of coating facilities, including Serra in Brazil, Orkanger in Norway and Channelview in the United States during 2019-2020. Coating work under these contracts is…
US Oil Production Up, Needs More Pipelines
The rising domestic crude oil production in the United States has created a need for more pipeline capacity, revealed the US Energy Information Administration (EIA).EIA recently launched a new liquids pipeline projects database that tracks more than 200 crude oil, hydrocarbon gas liquids (HGL), and petroleum products pipeline projects."Rising domestic crude oil production has led to several changes in Gulf Coast crude oil supply and demand patterns, creating a need for more pipeline capacity," it pointed out.Crude oil pipeline capacity additions originating in the Gulf Coast region represent most of the scheduled pipeline capacity growth over the next few years.
Solitaire on Nord Stream 2 Job in Russia
Allseas-owned pipelay vessel Solitaire has started laying the first line of the Nord Stream 2 twin gas pipeline in Russian waters.Solitaire will spend about a month constructing one of the two approximately 100-kilometres-long sections in the Russian territorial sea.Solitaire, operated by Allseas, is a 300-metres-long and 41-metres-wide dynamically positioned vessel that will lay pipes around the clock seven days a week. It accommodates up to 420 people on board.A vessel that is positioned using thrusters instead of anchors helps to minimise the impact on the environment and marine traffic, as only the pipeline itself touches the seabed along the pipeline route.The activities are performed in accordance with the national permits granted by responsible authorities.
TechnipFMC Orders Vallourec Pipes for Mero 1
The provider tubular solutions for the energy markets Vallourec Soluçoes Tubulares do Brasil has been awarded by TechnipFMC in Brazil to supply around 12,000 tons of seamless steel rigid line pipe with outside diameters 8” and 10”.The pipe will be used in the fabrication of the riser and flowline system for interconnecting 13 wells (6 production wells and 7 water alternate gas injection wells), to be installed in the pre-salt field Mero 1, which is part of the giant Libra reservoir.Libra covers an area of 1,550 square kilometers, equivalent to the size of the Brazilian city of São Paulo, with recoverable reserves estimated in the range of 8 to 12 billion of barrels of oil.The Libra Block has been developed under a consortium agreement with Petrobras (40% share) as operator…