Cavotec Wins Port Power Supply Deal for Malta’s Valletta Grand Harbor
Cavotec won a contract by Nidec ASI as part of its $14.5 million deal to provide ShorePower to five cruise liner berths at Malta’s Valletta Grand Harbor. The project is part of a major EU funded initiative by Infrastructure Malta to electrify the entire harbor and reduce portside ship emissions by 90%.Cavotec's ShorePower solution has been designed to meet the specific requirements of the Valletta Port and connect vessels over their entire port length. It includes the mobile cable management system, PowerMove, to provide ship-to-shore connectivity.
Europa 2’s Cold Ironing Connection Certified by DNV GL
Ultra-luxury cruise ship Europa 2 has had its cold ironing connection certified by classification society DNV GL following testing of the undisrupted use and compatibility of the shore-to-ship power system in the Port of Hamburg.While idled due to the coronavirus pandemic, Europa 2 has been using cold ironing at the Cruise Center Altona in Hamburg for the past 30 days, reportedly marking the first time a cruise ship has been using cold ironing for a long period of time.Europa 2, with a maximum of 500 passengers requires 2.2 megawatts (MW) of power per hour during its lay time.