GTT Bags LNG Carrier Tank Design Contract
France-based GTT said it has received a new order notification from a Korean shipyard for the tank design of a new 174,000 m3 liquefied natural gas (LNG) carrier, to be built on behalf of a European shipowner.
The LNG tanks of the vessel will be equipped with the Mark III Flex containment system developed by GTT. The vessel's delivery is expected during the second half of 2020.