Damen Lays Keel for New CEMEX Dredger
Damen Shipyards Group recently held a keel-laying ceremony for the CEMEX Go Innovation at Damen Shipyards Mangalia in Romania.
The vessel is the first Damen MAD – the next generation of marine aggregate dredgers. The construction of the new vessel is drawing upon collaboration with multiple companies within the Damen Group, as well was with external partners, working together towards the development of a new standard in marine aggregate dredging.
Damen has designed the future-proof vessel for long-lasting durability for operations in North Sea conditions over the coming decades. Particular attention has been paid to sustainability, safety and performance. The MAD will extract sand and gravel from the seabed at up to -55 meters.
During the ceremony, CEMEX Marine Fleet Engineering Manager Mark Williams undertook the traditional role of welding the coins. On this occasion the coins used were a British Pound, a Dutch Guilder and a Romanian Leu, commemorating respectively the regional base of the client, the home country of the shipbuilder and the location of the shipyard.
The keel-laying is the first to take place since Damen began the operational management of the shipyard now known as Damen Shipyards Mangalia in July this year. The yard, on the Black Sea coast, has three drydocks with a total length of 982 meters and 1.6 kilometers of berthing space. The 48 and 60 meter wide docks provide Damen with the capacity to cater for larger maritime vessels and structures.