NSU and Vale to Install Anemoi’s Wind-Assisted Propulsion on Ore Carrier

October 17, 2024

NS United Kaiun Kaisha (NSU) and Vale have reached an agreement to install rotor sails from Anemoi Marine Technologies on 400,000dwt-type very large ore carrier (VLOC).

The VLOC NSU TUBARAO has been engaged in a long-term transportation contract between NSU and Vale since its delivery in September 2020.

NSU TUBARAO with CGI Anemoi Rotor Sails (Credit: Anemoi Marine Technologies)
NSU TUBARAO with CGI Anemoi Rotor Sails (Credit: Anemoi Marine Technologies)

A rotor sail is a device for obtaining propulsion by using the pressure difference generated around a cylinder by rotating a cylindrical sail installed on the deck. It is expected to reduce fuel consumption and CO2 emissions from the ship by approximately 6-12%.

NSU has been actively working to make their vessels more efficient and reduce their greenhouse gas (GHG) emissions through the introduction of energy-saving devices such as rotor sails and by transitioning to ships powered by next-generation fuels.

The installation of the rotor sails on the ship is scheduled around September 2025.

Related News

ClassNK Issues AiP for Methanol Dual Fuel Bulk Carrier Retrofit Nordic Takes Deliver of MacGregor’s New Electric Heavy Lift Crane Retrofit Analysis Prepares Kamsarmax Bulk Carrier for Methanol Metal Shark to Debut High-Speed USV at Sea-Air-Space 2025 Kongsberg Bags Equipment Supply Order for DOF’s New OSV