New Landing Craft Delivered to the US Navy

November 22, 2022

The U.S. Navy has taken delivery of the next generation landing craft, Ship to Shore Connector (SSC), Landing Craft, Air Cushion (LCAC) 106 following the completion of Acceptance Trials with the Navy’s Board of Inspection and Survey to test the readiness and capability of the craft and to validate requirements.

“We are excited to deliver this next generation craft to the Navy and Marine Corps team,” said Capt. Jason Grabelle, program manager, Amphibious Assault and Connectors Programs, Program Executive Office (PEO) Ships. ”LCACs are providing our Navy and partners with the speed and agility essential to our missions.”

(Photo: Textron Systems)
(Photo: Textron Systems)

The LCAC program is in serial production, with an additional 11 craft currently being built at Textron Systems.

LCACs are built with similar configurations, dimensions and clearances to the legacy LCAC, ensuring the compatibility of this next-generation air cushion vehicle with existing well deck-equipped amphibious ships.

Related News

Explosion Kills Two on Icon Offshore Supply Vessel Two Vessels Report Attacks in the Red Sea off Yemen Yilport Planning $1.6 Billion Ports Expansion in El Salvador US Navy Christens the Future USNS Point Loma COTECMAR, Damen Join Forces for Construction of Frigate for Colombian Navy