Boskalis’ cable-laying barge Giant 7 has started the installation of the second and final nearshore export cable for the 700 MW offshore wind farm Hollandse Kust (west Beta), being built offshore the Netherlands.The works on the second cable follow the successful installation of the first, also performed by Boskalis’ Giant 7 barge.Giant 7, with the help of the specialist burial sledge tool BSSIII, will repeat the same operation to bring and connect the second cable to the shore.The two 220kV AC export cables are needed to connect the offshore wind farm to the onshore power grid…