MTNW Completes Project for USACE

November 10, 2011

MTNW Completes USACE St. Louis District Dust Pan Dredge Mooring Monitoring Project for US Army Corp of Engineers. Measurement Technology NW’s Mooring Line Monitoring System Retrofits US Army Corp Dredge Potter.


Measurement Technology NW (MTNW) announces successful implementation of its running line tensiometer technology with the US Army Corp of Engineers Dredge Potter. MTNW collaborated with C&J Offshore and Ockerman Consulting to ensure the mooring line monitoring project was successful from the initial design to the final installation and commissioning.
 

The US Army Corp of Engineers Dredge Potter is based near St. Louis and is charged with keeping the Mississippi passable. The Potter is a 240’ diesel electric vessel with a draft of 7’6”. It was recently retrofit during a deckhouse rebuild with a new haul winch and head hoist control system in 2011. The USACE contracted with Jensen Maritime Consultants (a Crowley company) and Ockerman Consulting to design the control system. C&J Offshore systems from Anacortes, WA were contracted to manufacture consoles and install these new controls. Ockerman Consulting chose MTNW’s Line Control Instrument RL-20175K 3-sheave running line tensiometers (RLTs) to monitor 2 mooring/hauling winches with 1.125” wire rope with a peak tension requirement of 84,000lbs.
 

“The MTNW line riders installed quickly and easily. The RLTs are obviously built for a rugged environment and will have many years of service,” said John Ockerman, Owner, Ockerman Consulting. “The displays are intuitive and easy to work with. If you look at the whole bridge control console, from analog sweep meters to the standard PC HMI, the MTNW LCI-90i bright display jumps out at you from across the bridge.” The RLTs are integrated with the Dredge Automation Systems and Shipboard Integrated Control & Monitoring Systems. This system’s architecture provides real time and historic data to the ship’s engineers and dredge production performance data remotely to USACE headquarters.
 

“MTNW RLTs are being used more frequently for mooring monitoring because our design provides a smaller footprint and rapidly deployable solution for retrofitting existing winches,” said Tom Rezanka, Managing Director of MTNW. “We can deploy on virtually any winch, with an installation time measured in hours, not weeks or months. In every environment, our customers are interested in monitoring and data-logging possible points of failure; and the mooring lines are a critical part of any dredge operations .”
 

Rezanka explains, “This is MTNW’s first installation on a dust pan dredge on the Mississippi. Our RLTs are frequently used to monitor pipe lay barges for offshore oil & gas installations around the world. We are pleased to be supporting the USACE here in the USA.”

Related News

AAPA Welcomes 2024-2025 Leadership Karin Orsel wins IMO Gender Equality Award MSE Int'l Wins Funding for Port Recharging Project Swedish, U.S. Marines Team @ Exercise Archipelago Endeavor 2024 Albany Port CEO Elected Vice Chair at National Ports Association