Buchanan Taps Blount/Barker for New Tug

April 23, 2001

Blount/Barker Shipbuilding signed a contract with Buchanan Marine, New Haven, Conn., for the construction of an 85 ft., 2,400 hp all welded, Twin Screw tug.

Powered by twin diesel engines through Twin Disc gears, the tug’s hull and superstructure plans have been contracted via Bristol Harbor Marine Design, which will utilize CAD/CNC technology for all lofting and cutting. The tug will be keel cooled and equipped with two, four-blade stainless steel propellers measuring 70-78-in., as well as two pushing winches and an Almond Johnson towing machine.

Used for harbor and ocean towing of bulk material barges, the tug is scheduled to commence construction in early April for a November completion.

Related News

Britain's New Shipping Sanctions Take Aim at Russian LNG Sector Shippers Race to Find Alternatives as US Port Strike Looms Vattenfall and BASF Pick Havfram for Nordlicht Offshore Wind Cluster Job Dutch See Rise in Russian LNG Imports, Urge Further Sanctions Families of Workers Killed in Baltimore Bridge Tragedy Sue Dali Owner, Operator