Alfa Laval Debuts Compact PureBilge

February 28, 2023

Alfa Laval announced the launch of PureBilge Compact, a compact version of the oily water separator PureBilge, designed to reduce the sytems footprint and ease install.

PureBilge Compact is dseigned to be a highly compact and modular solution that provides a great opportunity for small-segment vessels to benefit from the proven oily water separation technology without space and installation constraints. Its reduced footprint and hassle-free installation also makes it an ideal retrofit solution for bigger vessels struggling with filters.

(Image: Alfa Laval)
(Image: Alfa Laval)

PureBilge Compact is designed for 24/7 unmanned operation, which reduces the operation cost, just like PureBilge. The lack of requirement for chemicals, adsorption filters or membranes eliminates the filter replacement cost and lowers maintenance costs. Its continuous, single-stage operation requires less holding tank volume and provides more payload capacity. Its capacity flow of 600 l/h as compared to 2500 l/h to 5000 l/h for PureBilge, makes it smaller and easy to install.

With its integrated oil content monitor, PureBilge Compact cleans bilge water effectively by removing oil pollution below the 15 ppm IMO requirements and has the potential to reduce oil content even further, reaching below 5 ppm. This fully automated centrifugal separation system ensures continuous high performance, regardless of variations in feed, oil shocks and rough weather conditions.

PureBilge Compact comes with advanced EPC 70 automated control and monitoring system, which seamlessly integrates with existing Alfa Laval systems, providing a single user-friendly interface. The system is already compliant with the anticipated 2024 cybersecurity regulation.

Related News

CMB Tech Eyes India, Ship Disposals as Q3 Results Shine Are Fresh Vegetables a Key to Seafarer Happiness? Port of Los Angeles sees Record September, Best Quarter Ever CT Gateway Terminal wins $34M Grant for Zero-Emissions Equipment Seaway7 Secures Inter-Array Cabling Work for East Anglia TWO Offshore Wind Farm